construction projects Feasibility Study supporting system

Copyrighted Software by WIPO Copyright Treaty International Agreement

cpFSss© is a software supports planners and portfolio managers of construction projects, who work for investors, funding bodies, or engineering bodies in

  1. studying comprehensive project feasibility,

  2. determining the best selection between ‎several projects, and

  3. considering opportunity cost of the best selection.

Scope covers project influences (±) on Money, Time, Function, ‎Quality, Workers, Society, Economy, Environment, and Geopolitics

Assessment: cpFSss© created a novel method named ‎feasibility factors, which breaks-down project feasibility into feasibility elements, ‎then evaluates these elements via mathematical formulas of feasibility factors.‎

.

Inputs are variables of these formulas require inputs in form of percentages and numbers obtained via ‎questionnaires, websites, project data, and estimates. Numbers are converted into percentages using a single mathematical formula.

.

‎‎Outputs are values of project feasibility elements in the following 3 forms, which also are used ‎for comparison between up-to 5 projects:

  1. dual positive and negative values (%) of every feasibility element and overall dual values (%) of every project, ‎

  2. ‎‎single value (%) of every feasibility element and overall feasibility element value (%) of every project, and

  3. number (quantity) of feasibility elements of maximum positive and minimum negative values‎ of every project.‎‎

​​Project Types covered are:

  ‎

Building: (1) Residential, (2) Commercial, (3) Institutional as schools and hospitals and governmental building, ‎and (4) Industrial as factories, workshops, and mills; ‎
Infrastructure: (1) Transportation, (2) Irrigation, (3) Dams,(4) Water and sewer systems, ‎
Environmental: ‎(1)‎ Wetland restoration, (2) Hazardous waste cleanup, and (3) Recycling ‎facilities.‎
Power: (1) Power Generation as hydro-power plant, wind farms, solar power plants, geothermal-power plant, ‎thermo-power plant; (2) Power Processing as natural gas processing plant and oil refinery; and (3) Power ‎Distribution electro power transmission networks and natural gas transmission network. and ‎
Repair: items restoration of all construction projects during operation phase. ‎

Estimating project costs and duration required for IRR and several feasibility elements are supported via an ‎Excel file.‎ ‎
‎  For applicable WBS, cpFSss© performed the following modifications ‎to groups of ‎the standard ASTM ‎E1557: ‎
‎(1) adding groups for heavy construction projects, ‎
‎(2) adding preconstruction and commissioning and closeout groups, ‎
‎(3) adding a 5th breakdown level to every group, and ‎
‎(4) maintaining construction order of work items to a large extent. ‎
‎  Predecessors of work items of WBS 4th level are also determined to enable calculating early ‎finish of ‎these items and then the project duration. ‎